How To Shingle A Roof Peak
Nailing the cap.
How to shingle a roof peak. The cap must be positioned to minimize wind and weather damage after it has been nailed down. You ll need longer nails for this part as you re driving through more layers of shingles. Nail each side of the shingle to each side of the ridge just below the shingles self sealing strip. You can either use special shingles called ridge shingles or cut a number of regular shingles into 3 tabbed equal pieces and bend each so they fit snugly on the roof peak and nail them into place.
Remove existing roof and underlayment. If you re working with a flat sided cone roof you can use the standard hip and ridge installation method. Positioning of the cap. Install the next shingle approximately 2 3 past the seal strip of the first shingle.
Snap vertical chalk lines from the cone tip to the eave center on each of the flat sides. Your last shingle is an exposed shingle. Place the first shingle end flush to the edge of the roof. How to shingle a roof 90 pics pro tips recommendations step 1.
Many pros shingle in a vertical line up the roof because it s much faster. Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps. Use a standard hip and ridge shingle to complete the hip joints. This picture gives you an idea of the condition of the existing roof plywood and you.
Then apply shingles to the flat areas cutting at the hips or joints. How to cap an asphalt shingled roof preparing the peak. The original plan was to preserve a portion of the existing roof since.